The process regarding the deregulation of the necessary processes in the field of construction involves a significant reduction in the time required for the examination of a construction nature.
If earlier such a plan, the examination could last up to one and a half months, while quite often there was a need to obtain a number of additional and related conclusions, then for a given period of time, obtaining an expert assessment on a construction object will take no more than 20 days.
The main factor in reducing the actual time for obtaining an independent assessment from experts is the work of these same experts with preliminary and pre-project versions of proposals, after which the project support procedure takes place at all subsequent stages of its creation. Such information was received from Mr. Tarasevich, who is the director of Ukrainian Construction Expertise LLC. At the same time, everything possible is being done to eliminate possible errors on the part of the designers themselves, and not to carry out subsequent correction of already made errors. This approach seems to be more constructive in its essence, since it is aimed at a practical result, thereby achieving significant savings in time, nerves and money, both for the designers themselves and for the customers of such projects.
At the moment, a rather positive urban planning situation has developed in the country: all the necessary procedures for issuing the necessary permits have been simplified as much as possible, and there has also been an increase in personal responsibility for identified violations. In addition, you need to use the services of professional companies, such as, which provides high-quality engineering and construction surveys. All this contributes to the fact that the customer himself was aimed directly at working with state experts.